Manually place cased battery cells into the fixture and press them with a pressing plate. The fixture is then transferred by a robotic arm along with the battery cells. On the equipment, the batteries undergo the following processes sequentially: top sealing→side sealing→ bottom sealing→ corner sealing→ insulation testing→ NG sorting. Afterward, the batteries are removed by the robotic arm, and the fixture automatically recycles.
Technical Parameters
|
Model |
JD-6CF-300(Customizable size) |
|
Adapted Battery Specifications |
L×W×H:(10-300)×(5-250)×(2-12) |
|
Sealing Time |
Adjustable from 1 to 99 seconds |
|
Time Accuracy |
0.1s |
|
Sealing Head Working Temperature |
MAX 2500C |
|
Temperature Control Accuracy |
±20C |
|
Sealing Head Length |
300mm |
|
Sealing Head Width |
6mm(customizable according to customer requirements) |
|
Sealing Head Pressure |
Adjustable from 0 to 0.6 MPa |
|
Sealing Head Parallelism |
±0.01mm |
|
Production Capacity |
400-600EA |
|
Dimensions |
1400 x 2000 x 1700 mm (L x W x H) |
|
Power Supply |
AC220V/50HZ Power:4.5KW |
|
Air Supply |
0.5-0.8MPa |
|
Weight |
1000KG |
Contact: Miss Xie
Phone: 13927337964
Tel: 13927337964
Email: Overseaservice@fulithium.com
Add: 102 Shunfeng Rd, Rm 303,Qingxi Town, Dongguan City,Guangdong Province, 523651 China